English
排放后处理
应用案例>排放后处理

Ji An Hospital DPF Project下一个案例上一个案例返回列表页

Ji An Hospital DPF Project

Projecy location: Ji An Jiangxi Province

Application: Standby generators

Purification level:Ringelmann Blackness Level one

Project Overiew:East Hospital Ji An Hospital is located in Jian Nan Road, Jizhou Qu, Jian, Jiangxi Province.The total land of hospiatl is 270 acres and total construction area of about 126,500 square meters, design beds 1280. Outpatient and inpatient building fitted with two backup diesel generators a 696KW, 1280KW to prepare for a power outage use, the generator use diesel fuel, diesel generating nitrogen oxides in the process of incomplete combustion, carbon monoxide, particulate matter , sulphides and gas blackness, if not treated and discharged directly, will have some impact on the surrounding environment.
Based on customer needs, K4 Innovation provide customers with a complete package of diesel engine exhaust treatment options, site installation and commission,successfully passed customer acceptance.